Tamdy Cloud
Kuryk SEZ, Mangystau · Tier III/IV design
A green energy-and-digital cluster using cryogenic cold from an adjacent LNG re-gasification terminal as primary cooling — near-zero marginal cooling cost. Powered by a gas-turbine station with integrated solar, structured for green-bond financing.
10–100 MW
Planned IT capacity
PUE ~1.2
Target efficiency
500 racks
Initial capacity, incl. AI/HPC
Tier III/IV
Uptime + TIA-942 path